Construction of laboratories on the 3rd floor of the Institute underway

发布者:胡嘉鑫发布时间:2022-02-28浏览次数:28

 

The construction of the laboratory on the 3rd floor of the Institute is currently underway.

 

The 3rd floor of the Institute includes a number of high-level experimental spaces such as biosafety P2 laboratory, water quality analysis laboratory, materials characterisation laboratory, water treatment experiment, pilot laboratory, high temperature laboratory, photocatalysis and new energy laboratory, reagent storage room and data processing laboratory.

 

At the same time, academic discussion rooms and research staff offices are proposed to be set up on the third floor to meet the research and postgraduate training needs of the Institute in the areas of photocatalytic materials in water treatment, water ecology and new energy.

 

In addition, a numerical simulation laboratory will be bulit on the 2nd floor to strengthen the research capability of the Institute in numerical simulation calculation of photocatalytic materials application processes and equipment.